Wastewater TreatmentCase Study

Kamoa Copper, DRC: 900 KLPD Steel Tank Wastewater Treatment Plant for a Mining Operation

Mining operations generate large volumes of wastewater. Kamoa Copper in the Democratic Republic of Congo needed a plant that could treat 900 kL every day to a quality suitable for environmental discharge, so SewTreat designed a dedicated high-capacity steel tank wastewater treatment plant around the demands of the mining environment.

Project snapshot

900KLPD

Wastewater treatment capacity

  • LocationDemocratic Republic of Congo
  • IndustryMining
  • Plant900 KLPD Steel Tank Wastewater Treatment Plant
  • Final water useEnvironmental discharge

The Challenge

Kamoa Copper required a high-capacity wastewater treatment solution to manage wastewater generated by its mining operations. The system needed to provide reliable treatment performance while ensuring the final effluent was suitable for environmental discharge. The required capacity is 900 kL per day.

The Solution

SewTreat proposed a 900 KLPD steel tank wastewater treatment plant designed to provide reliable and effective treatment for the Kamoa Copper operation. The solution is designed around the requirements of the mining environment, with a focus on consistent treatment performance and achieving the required quality for environmental discharge. The system provides a dedicated solution capable of managing significant wastewater volumes while supporting responsible environmental management.

Plant Benefits

  • High-capacity 900 KLPD wastewater treatment.
  • Reliable treatment for mining operations.
  • Supports environmental discharge requirements.
  • Improved wastewater management and operational resilience.
  • Supports responsible environmental stewardship.

Managing wastewater at a mine?

From sewage to process effluent, we design high-capacity treatment plants for mining operations, for compliant discharge or for reuse.

Get a Quote

Frequently Asked Questions

Can mine wastewater be reused instead of discharged?

Often, yes. Depending on the mine, sewage and process plant effluent can be treated to process or potable water quality and recycled. This reduces the mine’s overall water requirement, because less water needs to be procured.

Which type of treatment plant suits a mining operation?

It depends on the flow and the site. Steel tank plants are economical for large flows (50 kL to 30 ML per day), while containerised plants (5 kL to 500 kL per day) can be relocated between sites. Civil constructed plants can be a good choice when appearance matters or the area experiences frequent power outages.

What does 900 KLPD mean?

KLPD stands for kilolitres per day. A 900 KLPD plant is designed to treat 900,000 litres of wastewater every day.

Get a quote

Need a Wastewater Treatment Plant?

Whether you need borehole water treated to drinking standard, a compliant wastewater treatment plant or a water reuse system, we handle everything from consultation and design to installation and operational support.

  • Turnkey delivery: consultation, design, manufacturing, installation, construction and operational support
  • We guarantee final water will comply with all necessary requirements
  • Steel tank, containerised and civil constructed plants from 5 kL to 30 ML per day
  • Onsite treatment and reuse can save up to 80% on water utility bills
Prefer to talk to someone?+27 60 015 6629

Request a quote

Tell us about your site and your water or wastewater requirements. We will be in touch to discuss the right solution.

Your details are only used to respond to your enquiry.

More case studies

Explore More Projects