Wastewater TreatmentCase Study

Northgate Mixed-Use Development, Harare: 3 MLD Wastewater Treatment Plant with Flexible Capacity

A growing development produces far less wastewater at the start than it will at full build-out. For the Northgate mixed-use development in Harare, SewTreat designed a 3 MLD wastewater treatment plant with two 1.5 MLD treatment trains that can handle flows from around 250 KLPD up to 3 MLD, with the treated water reused for irrigation.

Project snapshot

3MLD

Wastewater treatment capacity (2 × 1.5 MLD trains)

  • LocationHarare, Zimbabwe
  • IndustryMixed-Use Development
  • Plant3 MLD Wastewater Treatment Plant, two 1.5 MLD treatment trains
  • Final water useIrrigation
  • StandardZimbabwe Green Normal Standards

The Challenge

The Northgate mixed-use development required a wastewater treatment solution capable of treating wastewater to a final quality compliant with Zimbabwe Standards. The system also needed to provide operational flexibility so that treatment capacity could be adjusted according to the development’s wastewater flow requirements.

The Solution

SewTreat proposed a 3 MLD wastewater treatment plant equipped with two 1.5 MLD treatment trains. Each treatment train features supplementary flow-through piping at the lower levels, allowing the effective capacity to be reduced when required. This configuration enables the plant to accommodate a broad capacity range from approximately 250 KLPD up to 3 MLD. The treated final water is designed to comply with Zimbabwe Green Normal Standards and can be reused for irrigation.

Treatment process

  1. Two 1.5 MLD trainsIndependent trains for operational flexibility
  2. Flow-through pipingReduces effective capacity when flows are low
  3. Treated effluentDesigned to Zimbabwe Green Normal Standards
  4. Irrigation reuseTreated water suitable for irrigation

Plant Benefits

  • Total treatment capacity of up to 3 MLD.
  • Two independent 1.5 MLD treatment trains.
  • Flexible operating capacity from 250 KLPD to 3 MLD.
  • Final water designed to comply with Zimbabwe Standards.
  • Treated effluent suitable for irrigation.

Building a development in phases?

We design wastewater treatment plants that scale with your development, so you are never over- or under-built. Tell us your expected flows.

Get a Quote

Frequently Asked Questions

Why design a wastewater treatment plant with two treatment trains?

Two independent trains give operational flexibility. At the Northgate mixed-use development, supplementary flow-through piping at the lower levels allows each train’s effective capacity to be reduced, so the plant can accommodate flows from approximately 250 KLPD up to 3 MLD.

Can treated wastewater be used for irrigation?

Yes. Once wastewater is treated to the required standard it can be reused for irrigation. At the Northgate mixed-use development, the final water is designed to comply with Zimbabwe Green Normal Standards and can be reused for irrigation.

What are Zimbabwe’s Blue and Green effluent standards?

Zimbabwe classifies effluent discharges into colour-coded bands according to their environmental risk, with blue the safest band, followed by green. The Northgate plant is designed to Green Normal Standards, while the Borrowdale plant is designed to Blue Normal standards.

Get a quote

Need a Wastewater Treatment Plant?

Whether you need borehole water treated to drinking standard, a compliant wastewater treatment plant or a water reuse system, we handle everything from consultation and design to installation and operational support.

  • Turnkey delivery: consultation, design, manufacturing, installation, construction and operational support
  • We guarantee final water will comply with all necessary requirements
  • Steel tank, containerised and civil constructed plants from 5 kL to 30 ML per day
  • Onsite treatment and reuse can save up to 80% on water utility bills
Prefer to talk to someone?+27 60 015 6629

Request a quote

Tell us about your site and your water or wastewater requirements. We will be in touch to discuss the right solution.

Your details are only used to respond to your enquiry.

More case studies

Explore More Projects